The construction of the boiler room | BTS-ENGINEERING
The construction of the boiler room for the production of frozen semi-finished products was carried out in the village of Bugrin, Rivne region, on the territory of the workshop.
The boiler room is located in a separate building (dimensions in axes 6.0 X12. 0 m, height to the bottom of the coating 4.2 m). The heat scheme of the boiler house consists of two Vitoplex PV1 gasified boilers with a capacity of 500 kW each, two plate heat exchangers with a capacity of 200 kW, and two capacious Vitocell-H300 hot water storage boilers with a capacity of 500 liters and a capacity of 97 kW each. In the future, to cover the estimated heat flows to the centralized hot water supply, it is possible to install a third boiler of similar capacity, capacious hot water storage boilers. The prospective boiler will be guided by the provided automation system.
Backup and emergency boilers are not provided.
The thermal scheme of the boiler room provides:
- release of the required quantity and quality of the heat carrier depending on external parameters;
- protection of the hot water boiler from overpressure. To prevent an increase in pressure in the boiler, a safety valve Ø 40 mm is installed, set to a trip pressure of 0.4 MPa;
- protection of the hot water boiler from "heat shock" and condensation of moisture in the combustion products;
operation of all elements of the thermal circuit under the supervision of permanent qualified personnel.
SUMMARY TECHNICAL AND ECONOMIC INDICATORS OF THE PROJECT
№ n/a | Name of the indicator | Unit of measure | Value |
1 | Installed heat capacity | MWt Gkal/h | 1 0,86 |
1.1 | Annual heat output | Thous. Gcal | 4,4763 |
2 | Annual expenses |
|
|
2.1 | of natural fuel | thousand n m3 | 604,4 |
2.2 | of equivalent fuel | t. u. p. | 695,4 |
2.3 | electricities | thousand kWh | 42,129 |
3 | Standard fuel consumption rate per 1 Gcal of generated heat | kg.u. p/Gcal | 155,3 |
4 | Estimated amount of capital investment in the project volume, total | thousand UAH. | 162,255 |
4.1 | including the cost of the CMR | thousand UAH. | 431,786 |
4.2 | including the cost of equipment and furniture and inventory | thousand UAH. | 761,803 |
4.3 | including the cost of other work and expenses | thousand UAH. | 458,667 |
5 | including the cost of other work and expenses | months | 4 |