The reconstruction of the building | BTS-ENGINEERING

Services / Design /

The boiler room automation system provides for operation without permanent maintenance personnel.

 

The project includes reconstruction of the building of shop of consumer goods in the premises of the technological boiler with a year-round cycle of work with supply of all kinds of heat consumption of the single fluid - saturated steam with pressure of 1.0 MPa and a temperature of 174.5оС.

 

To cover the calculated heat loads, the working project provides for the installation of two TNS 50/10 steam boilers produced by the "Czech boiler plant". The boilers are supplied with an integrated water-tube steel economizer, a G11/2-A Weishaupt mounted gas burner with smooth power control, automation and safety systems, shut-off, control and safety valves, within the scope of the boiler delivery. All equipment is certified in Ukraine and has permits for use by the state supervision of labor, Gosgorpromnadzor.

Main technical and economic indicators of the working project

n/a

Indicator

Remark

Title

Numerical value

1

Installed heat capacity

kW

 

 

 

Gcal/hour

 

2

Heating capacity of the boiler room

 

 

 

2.1

kW

 

Gcal/hour

 

t/hour

 

2.2

annual

ths.MJ

Гкал

3

Fuel consumption

 

 

 

3.1

natural

 

 

 

3.1.1

hour

n.m3

3.1.2

annual

tih.n.m3

3.2

conditional

 

 

 

3.2.1

hour

t. u. p.

 

3.2.2

annual

т.у.п.

 

4

Specific consumption of conventional fuel

kg.u. p/Gcal

 

5

Installed capacity of electric consumers in the boiler house

kW

 

6

The consumption of electric energy

 

 

 

6.1

sentry

kW*h

 

6.2

annual

ths.kW*h

 

7

Specific consumption of electric energy

kW*Gcal

 

8

Water consumption for own needs

м3

Annual Кw= 0,5

8.1

Specific water consumption

m3/Gcal

 

9.1

Estimated amount of capital investment in the project volume, total

thousand UAH

 

9.2

including the cost of the CMR

thousand UAH

 

9.3

including the cost of equipment and furniture and inventory

thousand UAH

 

9.4

including the cost of other work and expenses

thousand UAH

Including VAT

10

Estimated labor intensity of the CMR

thousand people*hour

 

11

Standard duration of the CMR

months

 