Major repair of the boiler house | BTS-ENGINEERING
Boiler house with two modern energy-saving biomass boilers "KALVIS-100". The installed heat capacity of the boiler house is 200 kW.
Major repairs of the boiler house were carried out with the co-financing of the UN Development Program in Ukraine.
1 | Installed heat capacity | kW | 200 |
|
|
| Gcal/hour | 0,172 |
|
2 | Heating capacity of the boiler room |
|
|
|
2.1 | kW | 184,000 |
| |
Gcal/hour | 0,158 |
| ||
t/hour | 7,91 |
| ||
2.2 | annual | thousand MJ | 3036,4 | When the operating mode is set |
Gcal | 725,2 | |||
3 | Fuel consumption |
|
|
|
3.1 | natural |
|
|
|
3.1.1 | hour | kg | 56,5 | |
3.1.2 | annual | t. u. p. | 122,9 | |
3.2 | conditional |
|
|
|
3.2.1 | hour | t. u. p. | 28,3 |
|
3.2.2 | annual | t. u. p. | 61,43 |
|
4 | Specific consumption of conventional fuel | kg.u. p/Gcal | 178,57 |
|
5 | Installed capacity of electric consumers in the boiler house | kW | 2,35 |
|
6 | The consumption of electric energy |
|
|
|
6.1 | sentry | kW*час | 1,95 |
|
6.2 | annual | thousand kW*hour | 8,9 |
|
7 | Specific consumption of electric energy | kW*Gcal | 26,0 |
|
8 | Water consumption for own needs | m3 | 7,8 |
|
8.1 | Specific water consumption | m3/Gcal | 4,33 |
|
9.1 | Estimated amount of capital investment in the project volume, total | thousand UAH | 299,653 |
|
9.2 | including the cost of the CMR | thousand UAH | 164,250 |
|
9.3 | including the cost of equipment and furniture and inventory | thousand UAH | 68,744 |
|
9.4 | including the cost of other work and expenses | thousand UAH | 66,658 | Including VAT |
10 | Estimated labor intensity of the CMR | thousand people*hour | 2,999 |
|
11 | Standard duration of the CMR | months | 3 |
|